Embedding operational readiness into new, fully automated rapid transit lines and extensions for the Paris Metro

Operating as a shadow operator to provide independent insight into how large-scale systems would perform in real service

Millions

Projected daily passenger journeys

4

GoA4 (Grade of Automation 4) lines operating with Unattended Train Operation (UTO)

68

New stations

200km

Fully automated metro lines

THE CHALLENGE

Pre-operations design and testing for metro network

Slow risk identification

Operational risks identified too late will become embedded into the system, resulting in long-term constraints

Stakeholder management

Complex interfaces across multiple stakeholders require alignment between design and contracts

Maintenance constraints

Operations and maintenance assumptions must be executable within tight access windows

Unproven performance

Safety, performance and reliability targets must be achievable in live service

Creating operational clarity

The consortium operated as a neutral, operator-led advisory layer, bridging infrastructure delivery and future operations.

Strategy review

Review maintenance strategies and operational assumptions against realistic service conditions

Design validation

Review system design and integration through an operator lens

Target consistency

Ensure consistency between design, operational expectations and contractual targets

Risk assessment

Conduct independent assessments on safety, hazard analysis and reliability risks

Structured transition

Support a structured transition from project delivery to appointed operations

KEY INSIGHT

Driving long-term reliability by bridging the gap between infrastructure design and live operational execution

Greater clarity on operational and maintenance readiness enables earlier identification of risks affecting reliability and maintainability. This strengthens alignment between infrastructure design and operational requirements, improving stakeholder coordination through neutral facilitation and supporting more effective onboarding of future operators through structured handover.

TARGETED INTERVENTIONS

Operator-led advisory through a shadow operator consortium

Shadow operator perspective

Assess the programme as a future operator to identify risks invisible from a delivery-only viewpoint

Operations & maintenance readiness

Review maintenance strategies and readiness plans to ensure alignment with realistic service conditions

System and design validation

Analyse system design, configuration and integration through an operator lens to support safe operations

Safety and risk evaluation

Conduct independent assessment on safety documentation, hazard analysis and reliability risks

Interface and contract alignment

Ensure consistency between infrastructure design, operational expectations and contractual performance targets

REGULATORY PRIORITIES

Operator-led advisory embedded within governance frameworks enables infrastructure programmes to run safely and perform reliably

01

Independent validation

Shadow operator models strengthen operational assurance in large programmes

02

Governance alignment

Interface and contract alignment to review protocol, frameworks, stakeholder integration and consistency

03

Decision traceability

Independent operator-led advisory enhances transparency and decision auditability

04

Complex interfaces

Implementation must occur within a multi-stakeholder, highly regulated environment

Capabilities in action

View more case studies

Depot & fleet management + Digital operations & command systems + Maintenance digitalisation + Predictive & condition-based maintenance + Data integration & platforms

OUTCOMES

Validated automated operationsAligned stakeholder executionAssured day-one reliability

Millions

Projected daily passenger journeys

4

GoA4 (Grade of Automation 4) lines operating with Unattended Train Operation (UTO)

68

New stations

200km

Fully automated metro lines

Ready to optimise your transit operations?

Let's build systems that perform consistently under variable demand, every day.