CASE STUDY | READINESS CLARITY

Building Operational Capability for Mauritius’ First Rail System

Metro Express, Mauritius

Leveraging operator expertise to build operational capability, train local teams and launch Metro Express, Mauritius’ first Light Rail Transit network

Operational readiness from first launch through phased expansion

26km

Route length across major cities

19

Stations integrated, including 2 elevated and 17 at-grade

4

Successive expansion phases audited

Complete operational readiness

Pre-operation SOPs developed to support day-one operations

THE CHALLENGE

Delivering Mauritius’ first LRT safely into service while building operational capability

First-of-its-kind network

Build capability from the ground up for a brand new transit mode, while ensuring absolute safety for phased commercial rollouts

Local capability

Develop a completely new operations team capable of running the LRT system from scratch without prior national rail experience

Road-rail integration

Integrate a new LRT safely within existing roads, traffic systems and public transport networks, while coordinating across multiple external agencies

Phased expansion

Provide independent safety oversight for multiple sequential phase launches across Curepipe and Port Louis

Creating operational clarity

A structured path from operational readiness to safe launch

Operational foundation

Develop SOPs and support pre-operation activities to prepare the organisation, systems and processes for service

Capability transfer

Train the local operations team to take on the day-to-day operation and maintenance of the new LRT network

Readiness assurance

Conduct independent safety audits across successive expansion phases before each enters commercial operation

In-service support

Carrying operator expertise from pre-operations into live service after launch for Phase 1

KEY INSIGHT

Building capability for sustainable rail operations

Operational success depends on structured capability transfer and independent oversight before passenger service begins. By embedding real-world operator expertise, comprehensive local training and rigorous safety assurance into the pre-operations phase, STRIDES supported a seamless transition to live service and long-term operational resilience.

TARGETED INTERVENTIONS

Operator-led readiness from day one

Strategic scoping

Determine a feasible alignment for the LRT, develop the reference design and assess options for future network extension

Pre-operation consultancy

Draft comprehensive standard operating procedures and support Metro Express Limited through all pre-operation activities to ensure day-one readiness

Workforce capability build-up

Provide on-the-ground support to train and develop a local operations team fully capable of independently running the LRT Phase 1 network

Independent Safety Audit (ISA)

Conduct rigorous independent safety audits for Phases 2A, 2B, 2C and 3 to support safe commercial operations as planned

REGULATORY PRIORITIES

Operational readiness and independent safety assurance embedded across successive phases

01

Operational readiness

Supported pre-operation planning, procedures and capability-building to prepare Metro Express Ltd for the safe operation and maintenance of Phase 1

02

Independent safety assurance

Conducted Independent Safety Audit (ISA) for Phase 2A, successfully completing the engagement in 2021

03

Assurance across expansion

Continued appointment for the ISA of Phases 2B, 2C and 3 provided safety assurance as the network expanded through successive stages

04

Safe entry into service

Each subsequent phase successfully entered commercial operation as planned, supporting the controlled transition from project delivery to live passenger service

Capabilities in action

View more case studies

Depot & Fleet Management + Integrated Digital Operations & Command Systems + Data Integration & Platforms + Maintenance Digitalisation + Predictive & Condition-Based Maintenance

OUTCOMES

Safe launch and phased expansion

Operational readiness, local capability-building and independent safety assurance supported Metro Express from pre-operations through successive commercial expansion phases

26km

Route length across major cities

19

Stations integrated, including 2 elevated and 17 at-grade

4

Successive expansion phases audited

Complete operational readiness

Pre-operation SOPs developed to support day-one operations

Ensure day-one readiness for your new network

Connect with our experts to kickstart your system operational readiness